Existing surface
Tell us what is there now and whether anything needs to be removed.
A closer look at the published NN Paving driveway update, including the groundwork details that sit beneath the finished surface.

NN Paving’s September update describes a 600mm build-up across the front and retaining walls on both sides. Those details show why a driveway conversation should cover levels, ground preparation and the finished layout together.
This page only repeats details visible in NN Paving’s own project update. Site conditions, materials, costs and timings still need to be confirmed for each property.
Open the original Facebook update ↗A few practical notes help Leon understand the work before a site visit or quotation.
Tell us what is there now and whether anything needs to be removed.
Share any narrow access, slopes, steps or retaining features.
Explain parking, turning and the kind of entrance you want to create.
Tell Leon what you have in mind. Get a free, no-obligation quotation.